Customers
- Repair of the tank 2000 S-20 V=5.000 m³ in Gdansk refinery.
- Major repair of the storage tank V=3.200 m³ in Gdańsk refinery.
- New built truck distribution terminal in Gdańsk refinery – piping and mechanical contractor.
- New built asphalt processing plant „BITUROX” in Gdańsk refinery – piping and mechanical contractor.
- Upgrade of the 850 and 500 units (Gasoil Hydrodesulphurysation) in Gdańsk refinery.
- Maintenance shutdown in 2007 and 2009 – piping and mechanical contractor for (250–Hydrogen production plant, 260–Hydrogen recovery plant, 650–Amine regeneration I, 810–Sulphur recovery I, 820–Sulphur recovery II, 830–Sulphur recovery tail gas treatment unit, 860–Sour water stripper).
- Major repair of the tank 1900 S-1 in Gdańsk refinery V=5000 m3.
- Dismantling of the truck distribution terminal in Gdańsk refinery.
- New built Amine Regeneration Unit (ARU) and Sour Water Stripper Unit (SWS) plants in Gdańsk refinery – piping and mechanical contractor within the framework of the 10+development program.
- New built interconnection piping for the 10+ development program in Gdańsk refinery – piping and mechanical contractor.
- On spot rail car loading facilities for diesel designed by Dipl.-Ing. SCHERZER GmbH – piping and mechanical contractor.
- Repair of the tank 2000 S-29 V=5.000 m³ in Gdansk refinery.
- Development of the train distribution terminal to asphalt in Gdansk refinery.
- Major repair of the aircoolers 1300 EA 23 B and F in Gdansk refinery.
- Major repair of the exchanger 150-E15A/B and 150-E18A/B in Gdansk refinery.
- Mechanical works of the project: "Increasing the production and sale of asphalt to 1.3 million tons/year in the production plant of Gdansk".
Operator Logistyczny Paliw Płynnych Sp. z o.o. - Design, engineering and delivery of the anti-fall protection system on the rail distribution terminals in the handling tank farms in Rejowiec Poznański, Trzebież, Chruściel, Boronów.
- Major repair of the storage tank V=10.000 m³ in tank terminal in Nowa Wieś Wielka.
- General development and upgrade of the tank terminal in Nowa Wieś Wielka.
- Upgrade of the tank terminal in Dębogórze – development of distribution and handling system for loading the fuels into the tanker ships.
- Repair and upgrade of storage tank V=12.500 m³, tank V=5.000 m³ and tank V=1.000 m³ including engineering and execution of new fire fighting system in tank terminal in Koluszki.
- Repair and upgrade of storage tanks V=32.000 m³ and 2 tanks V=10.000 m³ including engineering and execution of new fire fighting system in the tank terminal in Nowa Wieś Wielka.
- Major development and upgrade of the tank terminal in Chruściel.
- Major repair of the storage tanks V=5.000 m³ and V=10.000 m³ in tank terminal in Strzemieszyce.
- Upgrade of storage tank V=18.000 m³ in tank terminal in Dębogórze.
- Repair and upgrade of the storage tank V=5.000 m³ in tank terminal in Skarżysko Kościelne.
- Repair and upgrade of the storage tanks V=2.000 m³ and v=5.000 m³ in tank terminal in Boronów.
- Reconstruction and development of fire fighting system in tank terminal in Koluszki.
- Engineering and erection of two tanks with capacity 10.000m3 for tank terminal in Emilianow.
- Engineering and erection of two tanks with capacity 10.000m3 for tank terminal in Koluszki.
- Development of the rail distribution terminal for tank terminal in Trzebież.
- Replacement of the roof of three storage tanks with capacity 1 x V=5000m3 and 2 x V=2000m3 in tank terminal in Koluszki.
- Oily water treatment plant for the production rig Baltic-Beta-offshore service.
- Repair and replacement of high pressure piping for the drilling rig Pertobaltic-offshore service.
- Repair services the rig jack-up system for the production rig Baltic-Beta-offshore service.
- Gas preparation and compression system for the production rig Baltic-Beta-offshore service.
- Engineering and erection of the steam tracing for gas preparation and compression system for the production rig Baltic-Beta-offshore service.
- Steam generation system for the production rig Baltic-Beta-offshore service.
PKN Orlen S.A. - Engineering, repair and upgrade works for piping and pump stations for tank terminal in Gdańsk.
- Engineering and construction of fire fighting systems for 5 tanks V=1.000 m³ and 3 tanks V=2.000 m³ for tank terminal in Gutkowo.
- Repair of the piping system and tanks for fuel handling tank farm in Krakow Olszanica.
- Development and upgrade of the truck and rail handling terminal for tank terminal in Gutkowo.
- Design, engineering and delivery of the anti-fall protection system on the rail distribution terminals in the handling tank farms in Szczecin, Nowa Sol, Gdańsk, Świnoujście, Gutkowo, Boleslawiec and Wrocław.
- Major redevelopment and upgrade of tank terminal in Gdańsk – replacement in new arrangement of all equipment and piping accompanied by major repairs of storage tanks while keeping the facility in service.
- Piping erection works during the service shut-down of the Plock refinery.
- Major redevelopment and upgrade of tank terminal in Swinoujście – replacement in new arrangement of all equipment and piping accompanied by major repairs of storage tanks while keeping the facility in service.
- Engineering and erection of two tanks with capacity V=10.000m3 for tank terminal in Wrocław.
ORLEN LIETUVA
- Maintenance shutdown in 2010 – piping and mechanical contractor for production instalations
PERN "Przyjaźń" S.A. - Replacement of 600 m of the Ø530mm transfer pipe under the river.
- Replacement valves Ø 1000 mm in tank farm in Gdansk.
- Dismantling of the four tanks V=200m3 in the airport tank terminal in Warsaw.
- Erection of the tank V=3200m3 for the JET A-1 fuel in the airport tank terminal in Warsaw.
- Replacement of existing piping for the JET A-1 fuel in the airport tank terminal in Warsaw.
- Adjustment of the tanks and piping system, engineering, delivery and installation of fuel distribution and loading system for JET A-1 fuel in tank terminal in Krakow Olszanica.
- New built medium delivery installation from PKN Orlen to PCC Rokita.
- Manufacturing and outfitting of several modules for „YME Work Over Unit” (weight 250 T, inc. 30 T piping and tubing, operating pressure up to 345 bars) forming major part of mobile intervention unit for YME Mobile Offshore Production Unit.
- Fabrication of steel structures for Billerud Gruvon Project.
- Fabrication of steel structures for Stora Enso Skoghall Project.
GELDOF METAALCONSTRUCTIE NV
- Erection of four tanks with capacity 10.000m3 and two tanks with capacity 20.000m3 for tank terminal in Amsterdam.
RUE “Gomeltransoil Druzhba”
- Construction of shell and water performance test for the V=75.000 m³ tank in tank terminal in Mozyr Bielarus.